[BOM Case Study] TOTO Ltd. Enhancing Operational Efficiency through BOM Consistency Assurance
Strong support for efficient information management with flexible customization! Ensuring BOM consistency while thoroughly eliminating unnecessary tasks and improving operational efficiency / Case studies.
We would like to introduce a case study on the implementation of "Hi-PerBT Advanced BOM" at TOTO Ltd., a manufacturer of water-related products, aimed at efficient data utilization in parts list-related operations. The company faced a requirement for a basic information management system to centrally manage master information scattered across various systems due to a large-scale replacement of core systems (SAP) and peripheral systems in one of its business divisions. After implementing our product, we received feedback stating, "We have successfully addressed the challenge of centrally managing master information, and there are requests for it to serve as a system for managing each BOM, including integration with 3D CAD information." [Challenges] - There is no interface to interlink design information and production information, making it difficult to ensure consistency between the design BOM and the manufacturing BOM. - Due to the large number of attribute items for scattered masters, the workload from individual manual input is high, leading to human errors. *For more details, please refer to the PDF document or feel free to contact us.
- Company:日立ソリューションズ西日本
- Price:Other